East Side Access CM006
Manhattan North Structures
Project Details
        
					ROLE
					Electrical Contractor
				
						CONTRACT AMOUNT
 $20 Million				
                    OWNER
                    NYC Metropolitan Transportation Authority
                
                    LOCATION
                    New York, NY
                
                    	ARCHITECT
	                    GEC (PB/STV/Parsons)
    	            
        	            SIZE
    	                3 Miles
	                
COMPLETION
2019
Project Description
			The project involved the fabrication and construction of permanent structural concrete lining, interior structures, as well as fit-out for caverns and tunnels previously excavated by others beneath the existing Grand Central Terminal located in Manhattan. This project also included the rehabilitation of the 63rd Street Tunnel and construction of the 63rd Street Duct Bench. Five Star Electric was responsible for the installation of underground duct banks within the tunnel and track invert. The role entailed installation of raceway systems for multiple rooms being constructed throughout the project. In addition, Five Star installed a grounding mesh system within the multiple levels of this newly-constructed cavern and installed duct banks and cable tray within the tunnel portions of this project in newly-created bench walls in Manhattan.

 
			 
			 
			 
			 
			 
			 
			 
			 
			